Monday 27 September 2010

Getting really bored of this now.

My goals for this year were to get the hull dried and sheathed, get the keel stubs strengthened and the keels attached, get the boat off the cradle and back down on the ground, fill and fair the hull and deck with an eye to priming and if the weather was good maybe topcoat too.

Well, the theory was great seeing as work is up and down i thought i would get quite alot done, but from the above all i have is the keel stubs ticked off the list......oh yeah i forgot i wanted to mount the engine too, so that's something else.

I don't know what its going to take to get the readings down in the green but i'm fast running out of ideas, the new heater pads work a treat, its literally uncomfortable to stand near them at 100 degrees celcius - thought i had it made but no: left them on for a day and still no difference on the meter, so back to the drawing board.

I went off to the b&q and resolved to spend more money (i don't have) on four cheap wall paper strippers as this is a cheaper way of creating steam than a hot washer £80 vs £700 to buy or £200 a week to hire........"yeah can i call you back,"......i mean where do they get these prices from?

Anyway spent today (Mon) taping down the hull around the waterline creating a big skirt, fired up the strippers and have left them to boil the hull up. I'm going back to the idea of draw ng the moisture out by 'opening' the laminate up then washing off with fresh water at the end of each day.

I don't know whether it will take a few more weeks or the rest of the year but with money tight its not much fun and incredibly boring spending so much time and resources on this one particular problem.

cheers

No comments:

Post a Comment