Wednesday 20 April 2011

Success!

After finishing the pads on the inside of the coach roof it was time to cut in the gas locker so after waiting a couple of minutes for the brave pills to kick in i measured then measured again and just to be sure had one more look then went for it with the air saw.

These are great tools - no vibration relatively light too so all you have to worry about is holding the tool on the line, this enabled me to cut a perfectly accurate shape. I decided to start off small so did the gas locker on Friday which went successfully although i couldn't get over the thickness of the lay up in the cockpit (12 - 14 mm).

On Saturday i framed it up with marine ply creating the drainage detail and sides which will take the hinge and ram. It feels a bit hairy as the grain is raised from me drowning everything in resin but i'm pleased with the initial result so will start filling/fairing later in the week.

Monday came and buoyed with the success of the gas locker i decided to retire the brown trousers and red tunic such was my confidence and began marking out the big locker on the starboard side.

I'm pleased to report it went without a hitch and i now have the beginnings of two decent looking lockers. The point of this was to create storage and obviously to adhere to gas regulations but above all i hate those bloody sit-on mouldings that westerly made and fitted from the late seventies onwards.

They leak they don't look great imo and they're uncomfortable to sit on, the early boats (laurent giles era) had proper moulded-in lockers so i guess the accountants had a say in the making of the newer ones shame really.

No comments:

Post a Comment