Sunday 3 May 2020

A little slower than expected.

But given the fact i'm getting any materials delivered during lock down is something of an accomplishment, just a little frustrating when you actually have the motivation but are forced to wait. Still it all turned up Friday so got to work fitting reinforcement rings to my bulkheads and then got to cap them in solid Oak.

After today the fore cabin bulkhead shall be ready for paint and final fitting then just need to fettle the right hand saloon bulkhead and that too is ready for the same. One thing that took a lot of time - and hats off to Jack (Laurent Giles) for figuring out how back in the day - was floor heights, i know, niche right?

I must've spent a good day Thursday pondering not just floor but also door heights as the heads door can also close off the saloon all in a progressively diminishing space horizontally-speaking. I got there in the end, not helped by losing an old work diary from 2015 with all the fore cabin measurements i took before ripping everything out. Kinda made the job just that little bit more fiddly although the laser took the edge off - its a god-send for this work.

So by the end of this coming week i will have the saloon and fore cabin bulkheads in and finished then to join them both up, fore/aft-wise to make the heads to port and hanging space to starboard by way of two more bulkheads then that's the major structure put back in the front. 


No comments:

Post a Comment