Type the above into the search field on ebay.co.uk and you'll find the last few bits there.
Cheers
Yep the boats in the skip, the sheds empty, just need to extract the gold sovereigns from the keels and they'll be gone too.
Forces beyond my control finally forced my hand plus the pandemic, (and we all know what we've got to look forward to economically over the next 3-5 years) plus the ever rising cost of materials and my ever growing apathy that's been with me the last 8/9 years all played their part.
The boat didn't go quietly, a partially severed index finger during the kill process temporarily postponed the inevitable, (saw jammed in the grp then released straight through my finger) but then got back to it a few weeks later finishing yesterday. For what its worth the hospitals around my way are all but deserted, where the media gets this 'crisis in the NHS' narrative from i dunno.
My arse didn't touch the seat in Bournemouth when i was called to be patched up then went for surgery two days later to have the tendons and and other bits reattached in Poole General, again very quiet and have physio at Christchurch which is also pretty empty, I couldn't fault the service.
Still whilst chopping the boat up I observed the same structural problems i witnessed in 2015 sorting the fore peak that led me to pull my interior back out and remove the rest of the original interior. Another observation whilst slicing and dicing was how skinny and uneven the lay up was stem to stern; from the gunwale to waterline mine was no thicker than 6mm where as the deck was 15-18 mm solid laminate!
There was never the same thickness of laminate from one side to the other but i guess it was all hand laid. I should point out the hardest pieces of structure to remove were mine; i now realize i went completely overkill, that front end could've taken a direct hit from an oncoming vessel and nothing would've broke.
That was the only part of the boat i pretty much through in the skip in its original form, everything else got chopped up to around 300mm x 300mm pieces to stack down in a 10 yard skip. For those contemplating doing the same a chainsaw is rubbish, a Sawzell (recip saw) with metal cutting blades works great along side a 4" grinder with a 1mm thick metal-cutting disc in.
So what now?
Well I've been going through the parts locker, there is tons of stuff, the major piece being the engine which I've run up a few times in recent years and still only has 0.4 of an hour on it so will get the oils, filters, coolant and belts changed and get it advertised, should say if you're interested or know someone that might be then get in touch.
What else? There's..............well everything, instruments, hardware, full interior cushions (A- layout) various moulding's, mast, boom & spi pole, tanks, pumps, hoses, original interior fixtures, brand new heads, cooker etc. What i'll probably do is list everything here and on the WOA site with a guide price.
But other than that thanks for taking the time.
So even though i have my new super ace epoxy i'm going to give their 'rapid repair' product a go as it promises to cure in 1 -2 hours. I could of course get on doing other bits in the saloon which I have but as mentioned before there's an order in which everything goes together in this project so I'm a bit hamstrung in some jobs.
Its still 3D chess in the saloon but i'm used to it now, installing components in such a way so as not to fuck up the next bit. Yesterday was spent bending the galley bulkhead to my will, bit of a self-inflicted wound as i only spray finished one side and consequently it turned into a 4ft square fortune cookie. Never mind, half a dozen f-clamps, some swearing and strategically placed hardwood wedges later as well as three tubes of Puraflex 40 got it all under control.
I ummed and arghhed for a while deciding how to lay it out but eventually settled on the revised idea of sink & icebox to the left of the saloon door and oven plus a small drawer unit to the right. This is the most versatile layout i can come up with so you still have to sea-berths down either side and then with some rather spiffy joinery on my part pull the respective bunk fronts out and infill with the respective back rests and have a giant double, 8.5ft x 5ft.
This way, if your intimately acquainted with one another you can go for the giant double option and if not you can sleep separately along the boats length on either side. I will admit to wasting half a day with the laser and measuring tape working it all out and then quietening the voices of doubt in my head.
So as paid works not starting until mid June i may as well get on with building out the Heads and Hanging locker. Got the bulkheads finally finished how i wanted them & given more protection than a member of the Royal family.
I'm liking the fact i have standing headroom with about 70mm above my head in the main saloon so will be able to insulate and put a proper headliner panel in with room to spare. I got the compression post bolted in so that's a weight off my mind as the sapele post had a 6mm curve to it when the metal post was placed up against it.